33/11kV Substation Commissioning
Back to Projects Substation

33/11kV Substation Commissioning

Turnkey substation execution

Mandya, Karnataka
5 MVA
August 2024

Project Overview

End-to-end execution of a 33/11kV substation layout including civil works, equipment installation, and final statutory approvals.

The Challenge

The industrial area faced frequent power outages. A dedicated substation was required to ensure stable voltage and continuous supply for multiple industries.

Our Solution

We executed a turnkey substation project with 5 MVA power transformers, VCBs, and sophisticated relay protection. We also handled all liaisoning with KPTCL and CEIG.

Results

  • Stable voltage levels across the estate
  • Significant reduction in power tripping
  • 5 MVA capacity added to the grid
  • Full compliance with safety standards