Hebbal Industrial HT/LT Infrastructure
Complete transformer yard and distribution network
Project Overview
A comprehensive HT/LT infrastructure project for Hebbal Industrial Area including 1000KVA transformer yard, vacuum circuit breaker, metering cubicles, and underground cabling network.
The Challenge
The industrial area required a complete power infrastructure setup including transformer installation, protection systems, and distribution network with CESCOM approval.
Our Solution
We executed a turnkey project installing a 1000KVA transformer yard with vacuum circuit breaker, HT and LT metering cubicles, distribution panels, and an underground cabling network. We also secured 750KVA power sanction approval from CESCOM.
Results
- 1000KVA transformer yard commissioned
- 750KVA CESCOM power sanction obtained
- Complete UG cabling network installed
- Project completed in 45 days