Project Overview
Full-spectrum electrical design consultancy for a 200-bed multi-specialty hospital, prioritizing redundant power for critical care units.
The Challenge
Designing a fail-safe electrical system where power interruption is not an option (ICU, OT).
Our Solution
We delivered AutoCAD designs featuring dual-source supply, DG synchronization, and UPS integration for critical loads, compliant with NABH standards.
Results
- 100% Redundancy design approved
- NABH compliant drawings
- Optimized cable routing
- Accurate BOQ generation