Back to Projects
EV Charging
Taj Gateway Resort EV Charging
Premium hospitality charging infrastructure
Project Overview
Installation of EV charging facilities at Taj Gateway Resort Coorg, enabling guests to charge their electric vehicles during their stay.
The Challenge
Installing high-power EV chargers at a premium resort property while maintaining aesthetic integration and ensuring reliable power supply in a remote location.
Our Solution
We installed a 60kW DC fast charger and a 22kW AC destination charger with seamless integration into the resort parking area, ensuring minimal visual impact and reliable operation.
Results
- Premium guest amenity added
- 60kW DC fast charging available
- 22kW AC destination charging
- Seamless resort integration